English   Nederlands   Deutsch   Español 
 Home   Experiment   News   Science   Sponsors     Internal 
Bob and Daniel aligning the copper block (including coliseum) with the vacuum chamber and the pistons. The gold coated heads screwed onto the pistons stick slightly out of the guiding tubes.
The experiment rack after installation and alignment of the hydraulic pistons and the piston drive. Last works on the piston electronic box were finished by the Electronics Workshop (here: Ged and Marc) of the University of Strathclyde.
Helen, Daniel and Bob after having finished the integration of pistons, piston drive and top flange in Glasgow.
Back to the NEWS page